Detailed design and construction of n.1 reinforcement placing carriage (Lg. 12m) and n.1 Full Round ø5000 for the hydroelectric power station located between the Chira and Soria dams.
TFI – Tunnels & Formworks International SCOPE: Design, supply, transport, assembly and commissioning of n.1 12-metre Full Round ø5000, consisting of 6 rings of 2 metres each, and n.1 12-metre rebar placement carriage comprising:
– 1 main support beam for moving the formwork, 1 17 kW electro-hydraulic unit, 14 hydraulic jacks, 1 hydraulic winch for longitudinal movement, 4 rollers on the beam and 1 cable reel with 24 m of cable
For the initial section of the tunnel, a 4-metre formwork unit was prepared with the same specifications as those described above for the construction of the 12-metre formwork.